Façade Works

One-Stop Shop Service

Our facade business of the group provide the one-stop shop service. According to the difference façade of the building, our group design the curtain wall systems, window system, sliding door system, cladding system. etc to fulfill the local and international standard. The process of the facade business is as follows:

  • Design
    Since the external geometry of the building is various, our team will base on the architect’s design intent and the requirement such......

    Design:

    Since the external geometry of the building is various, our team will base on the architect’s design intent and the requirement such as the safety working, beam plus, to tailor make the prduct to suit the building.

    After the preliminary design, we will study the feasibility of the proposal with the architect, client and get their approval to process work

  • Calculation
    Structural calculation is an important aspect to the design of facade system, without careful planning and consideration......

    Calculation:

    Structural calculation is an important aspect to the design of facade system, without careful planning and consideration will cause the accidents occurred. government has set out safety regulation and code of practice for the trade . Since the safety is a major consideration of ACME’s company policy, we have employed the experience structural engineers for all design work to cope with the regulation.

  • Manufactory
    Manufactory according to our professional design. Those our choice supplier of manufactory and supplier had awarded with ISO9001 for their work......

    Manufactory

    Manufactory according to our professional design. Those our choice supplier of manufactory and supplier had awarded with ISO9001 for their work. Each of our product are manufactured under good workmanship and attains high quality standards.

    Material Inspection

    our company assign inspector team to the fabrication factory so as to supervise strictly raw materials and all accessories. QC in factory will check the incoming materials including the dimension, chromatic aberration, coating thickness, adhesion, rigidity and fluorocarbon coating. For glass, there are standards of dimension, chromatic aberration, flatness, and stress on tempered glass. For coated glass and insulated glass, we inspect the low-e films and dew point and air cavity depth respectively. Only qualified materials can be transferred to our storage.

    Cutting

    Before Cutting the material, all exposed surface will be protecxted by high quality protection tapew so as to avoid any scratch occured. Therefore, we clean the materials before cutting. The tolerance of cutting material shall be control below 1mm for materials. Each batch of materials shall be ensured under quality inspection according to drawings before being transferred to the fabrication process.

    Fabrication

    Fabrication process includes cutting, milling, tapping and punching etc. Before fabricating, working tables and tools shall be cleaned so as to avoid damages. QC shall be inspected each process to ensure the quality. Materials will be displayed in numerical after inspection by QC.

    Assembly

    Assembly is an important procedure to ensure the water tightness of curtain walls, therefore, we strictly apply sealant to the joints according to drawings to ensure the joint is tighted. The all assembly process shall be inspected by QC. When problem occured under the fabrication process, the immediately action shall be required for fixing such defect. The Non-conformity report and rectification proposal shall be issued so as to ensure the quality of product.

    Sealant Application

    The structural sealant which is usually used to fix glass to the frame. The application procedure shall be undergone in glazing room with constant temperature. The structural sealant shall be tested before the sealant process to ensure the quality of sealant. Before sealant appalication, the aluminum frame shall be cleaned with specialized primer. We stipulate that the place where is sealed by sealant shall be flat, glossy, smooth and free of wave strap and bubbles. In addition, the adhesive test of structural sealant shall be carried out by supplier such as Dowsil to encsure the application process is correct.

    Packaging and Shipment

    Before delivering completed products to the site, the product shall be completely inspected, including dimension, number, quantity, and water-tightness and etc., The completed production protection is also a key process. When the product have been completely cleaned and are free of dust, aluminum scrap, excess sealant and other sundries will be protected through packaging. At the same time, the interacting spot between aluminum materials and stillages shall be also carefully protected.

  • Installation and testing
    The well trained and experience workers are very important on our product installation, they can use the time management to fulfill the tight site process.

    Installation and testing:

    The well trained and experience workers are very important on our product installation, they can use the time management to fulfill the tight site process. Our professional team will ensure all our product, the installation steps are correct which also meets the standard of contract, goverment regulation.